Manual Testing in Gwalior

Manual Testing Training in Gwalior

Affy Informatics is best Testing Training Institute to provide High Class Training Plus Placements to all its students.This Manual Testing Training Course is designed to mould students into Testing professionals who can stand up to the challenge to enter IT Industry.

Testing and QA is the most significant part of any software. Learn the art of software testing where we sharpen your skills on writing test-cases, creating bug reports with live project assistance. Explore each and every aspect of Manual Testing as we bring you the most updated and an industry standard portion only affy informatics, Gwalior.

Our manual software testing course includes basic to advanced level and our manual testing course is designed to get the placement in good MNC companies.

Manual Testing Syllabus

Manual Testing Overview
  • Introduction to Software Testing
  • Product Vs Project
  • What is Quality?
  • Bug / Defect
  • What is testing?
  • Why Testing?
Software Development Life Cycle
  • Initial (or) Requirements phase.
  • Analysis phase Design phase
  • Coding phase
  • Testing phase
  • Delivery and Maintenance phase
  • How to choose model for Project
Where Exactly Testing Come into picture?
  • Conventional Testing
  • Unconventional Testing
Testing Methodology
  • Black Box Testing
  • White Box Testing
  • Gray Box Testing
Levels of Testing
  • Unit Level Testing
  • Module Level Testing
  • Integration Level Testing
    • Top down Approach
    • Bottom Up approach
    • Stubs & Driver
  • User Acceptance Level Testing
    • Alfa Testing
    • Beta Testing
  • System Level Testing (Non Functional Testing)
Software Development Models
  • Waterfall Model
  • Prototype Model
  • Evolutionary Model
  • Spiral Model
  • Fish Model
  • V-Model
  • Agile Process
Environments
  • One Tier Architecture
  • Two Tier Architecture
  • Three Tier Architecture
  • N- Tier Architecture
  • Difference between Web application and client server application
Types of Testing
  • Build Verification Testi ng/BAT/Pre SRN Testing
  • Smoke Testing and Sanity Testing
  • Regression
  • Re-Testing
  • Alpha Testing
  • Beta Testing
  • Static Testing
  • Dynamic Testing
  • Installation Testing
  • Compatibility Testing
  • Monkey Testing
  • Usability Testing
  • End-To-End Testing
  • Exploratory Testing
  • Security Testing
    • Authentication Testing
    • Direct URL Testing
    • Firewall Leakage Testing
  • Port Testing
  • Reliability Testing
  • Mutation Testing
  • Adhoc Testing
  • Globalization Testing
    • I18N Testing
    • L10N Testing
Test Planning
  • Contents of Test Plan
Test Development
  • Use Case Reviews
  • Types of Test Cases
  • Formats of Testing Documents
  • Testing Process
  • Test case design
  • Test design techniques
    • BVA
    • ECP and Error Guessing
  • Traceability Matrix
Test Execution
  • Execution Process
  • End-to- End Scenarios execution
Result Analysis - Bug Tracking and Reporting
  • Types of Bugs
  • Identifying the Bugs
  • Isolation the Bugs
  • Bug Life Cycle
  • Reporting the Bugs
  • Classical Bug Reporting
  • Common Repository oriented BRP
  • Bug Tracking Tool Oriented BRP
  • Bug Life Cycle (BLC)
Bug Tracking Tools
  • Bugzilla
  • TestLink
Test Closure Activity
  • Test Execution stop criteria
  • Test summary reports
Additional concepts
  • How the company will maintain the secured
  • Introduction to CR ? SVN Integration
  • What is Continues Integration
  • Jenkins Integration & Setup
  • Execute the programs from Jenkins
Real Time Process Awareness with Terminology
  • Quality Assurance
  • Quality Control
  • NCR
  • Inspection
  • Audit
  • CAPA
  • Software Configuration Management
  • Build Release process
  • SRN
  • S/W Delivery process
  • SDN
  • Reviews
  • Peer-Review
  • Traceability Matrix
  • Metrics
  • Test Bed
  • Escalation Process
  • Slippage
  • Base Lining the Documents
  • Publishing the documents
  • Common Repository Management
  • Patch Build
  • PPM
  • PPR
  • MRM
  • Defective Product
  • Change Request
  • Impact Analysis
  • Walk Through
  • Code Walk Through
  • Code Optimization
  • Work Around
  • Defect Age
  • Latent Defect
Testing Principles
  • Manual Testing
  • Automation Testing
  • Drawbacks of Manual Testing
  • Drawbacks of Automation Testing
Non Functional Testing
  • Load Testing
  • Performance Testing
  • Stress Testing
  • Volume testing
  • Soak Testing
  • Spike Testing